STEP BY STEP GUIDES

1. How to Request Electrical Installation or Maintenance

1. Message us on WhatsApp/Call with the job details: location, type of work, and photos if possible.  

2. We schedule a site visit for assessment and quotation.  

3. Once approved, we confirm materials, timeline, and cost.  

4. Our team completes the installation or maintenance to standard.  

5. You test, approve, and receive a service report.


2. Solar System Setup Process

1. Tell us your power needs: appliances, runtime, and budget.  

2. We design a system sizing for panels, battery, inverter, and charge controller.  

3. After approval, we deliver and install all components.  

4. We test the system and train you on basic operation and maintenance.  

5. You get a warranty card and our maintenance contact.


3. Inverter Installation & Backup Setup

1. Share your load requirements and available space for batteries/inverter.  

2. We recommend the right inverter and battery capacity.  

3. Installation includes wiring, changeover switch, and safety checks.  

4. We run a load test and show you how to monitor battery health.  

5. Post-install support available for battery replacement and servicing.


4. Fire Alarm System Installation

1. We inspect the premises and mark detection points based on layout.  

2. Install control panel, detectors, sounders, and cabling to code.  

3. Test all zones and program the panel.  

4. Train your staff on alarm response and silencing procedure.  

5. Provide maintenance schedule for annual testing.


5. CCTV Installation Guide

1. Walk through the site to identify coverage areas and blind spots.  

2. Mount cameras, run cables, and set up DVR/NVR and storage.  

3. Configure remote viewing on your phone or PC.  

4. Test night vision, motion alerts, and recording.  

5. Hand over login details and basic troubleshooting guide.


6. General Contracting Projects

1. Send project drawings, scope, or describe the work needed.  

2. We provide BOQ, timeline, and quotation.  

3. Work starts after contract signing and mobilization.  

4. Regular progress updates with photos.  

5. Final inspection, handover, and defects liability period applies

No comments:

Post a Comment

3kva solar system

 .` 3kVA solar system is perfect for running a 3-bedroom flat in Nigeria. It can power your TV, fans, lights, fridge, and even a small AC du...